|
SMC Home \ MS
Project Training Courses \Live Remote Training
Live Remote Instructor-Led Individual
Enrollment Training
Our remote training is live and it is instructor led.
You participate in Live-Remote training from your home or office. This
is live, real-time, instruction with the same live instructor who teaches
our onsite classes.
Logistics:
Our Live Remote Instructor-Led Training is
done across the internet - phone is used for voice. The only software
you need is an internet connection.
Instructions:
- Participates follow a URL to our Live Remote Instructor Led Training
Server
- Enter a session ID and password
- Place a call to the presenter for voice
- It's that easy!
Advantages:
The significant advantage we have over "self-paced", "internet","canned"
or "on-demand" training is clear and dramatic. The
instructor led class provides you with access to a knowledgeable expert
and an active peer group that can help you shape the content to your specific
needs. Here are some of the other Advantages:
- Save money by reducing or eliminating travel expenses
- Provide everyone in geographically distributed locations on the same
page at the same time
- Enhanced retention by offering half day sessions
- Get training for those persons who cannot afford to be out of the
office on consecutive days
- Enables smaller courses sizes and increases one-on-one student to
instructor interaction
- Anytime training eliminates the waiting for in-house and/or regional
training centers to become available
- Offer training on those days that all staff are at their optimum availability
rather than having them "cram" training into dates that were
good for the larger group
- Courses, materials and instructors are identical to our onsite courses
- The class-room is "open" 24/7 365!
How do I Participate:
Our live remote training system allows the instructor to see what is
on any of the student's monitors and to share the keyboard and mouse on
any of the student stations as needed. It is also possible for any of
the participants to "lead" a work session by taking control
of the instructor station. These collaborative features receive high marks
from our participants. An of course everyone is on the same phone conference
so feel free to ask questions of the instructor or other participants
at anytime.
What to Expect:
The experience is similar to a Web Ex or PC Anywhere session; participant
follow a URL to connect to the software and phone for voice. But unlike
Web Ex where you are a passive viewer, our Portal enables participants
to actually use the software on our system. Your users, located anywhere
in the world, can participate together in the same course.
When are courses held:
Because we are not limited by facility availability we do not have a
fixed course schedule. We schedule courses when we have four or more persons
with confirmed "waiting-list" registration. Once we have met
our minimum enrollment the instructor and the participants agree on the
specifics of course dates, times of day and hours per day for each session
|